You are here

New Building Construction, August 2023

Photos by Martha Van Pelt unless otherwise noted.

2023-08-01 Delivery docks2023-08-01 Delivery doors2023-08-01 Delivery east side2023-08-01 Digging for stormwater2023-08-01 Entrance door and truck repair bay2023-08-01 Front yard backhoe with Mark2023-08-01 Garage drain2023-08-01 Watch that first step2023-08-04 Excavation2023-08-10 Garage side Exit door2023-08-10 Garage side exit door2023-08-10 Garage side exterior wall2023-08-10 Garage side exterior walI 22023-08-10 Garage side exterior wall 12023-08-10 Original Exterior Wall2023-08-10 Original Exterior Wall 12023-08-10 South Exit Door2023-08-10 Welcome to SCLS sign2023-08-14 HVAC to roof2023-08-14 Roof Crane2023-08-15 Exterior wall remains2023-08-15 Former exterior wall2023-08-15 South exit door2023-08-17 Adding garage details2023-08-17 Connection between Delivery and administration2023-08-17 garage drain2023-08-17 Looking from sorting floor to old building2023-08-17 Sorting floor and garage2023-08-17 Sorting floor entrance2023-08-24 Sorting Floor poured, photo by Keller2023-08-24 Wet concrete, photo by Keller